Construction Of Proposed 5-Storey Social Sciences Building Complex, KNUST
Construction of proposed 5-storey Building complex consist of blocks (A,B,C,D&E) which entails lecture theatres, auditorium, classrooms and offices including associated external works, drainage and horticultural and walkways. The structure is basically reinforced concrete frame with sandcrete blocks in fillings sitting on strip foundations, roofed over with pre-painted long span aluminium sheet fixed onto structural timber or steel trusses.
The special installation include: Electrical, Plumbing and Mechanical Installation
Project Details
DATE
2017 – Ongoing
CLIENT
Kwame Nkrumah University of Science and Technology
PROJECT TYPE
Commercial