Bolgatanga Regional Hospital rehabilitation Project – Phase 3
The project consists of demolition of existing dilapidated buildings, and construction of Two-Storey Adjunct Clinic Block. The construction of the Adjunct Clinic Block
is made up of reinforced in-situ concrete structural frame on pad foundation. The building is partitioned and cladded with plastered block wall, and roofed with aluminium roofing sheet. Special installations include: The mechanical and electrical works include; power supply, lighting, fire alarm system, medical gasses systems, and air-conditioning. The external works include compound lighting, installation of transformers and generators, and plumbing works, which include underground water tank, and U-drain.
Project Details
DATE
2017 – Ongoing
CLIENT
Ministry of Health
PROJECT TYPE
Commercial